SWSOOS 1

This project required the cleaning, preparation and lining of three sections of the SWSOOS from the airport to Botany. The first section is an above ground aqueduct which was lined using a special HDPE liner, the other two sections were lined with conventional high build (20mm) epoxy coatings. Significant structural rehabilitation was required as a part of this large scale project. Total project value $11,000,000.00