Alexandria Aqueduct 

Introduction

This project was completed under two separate contracts. The first required the construction of temporary foundations and columns to support a 600mm HDPE pipe to bypass a badly deteriorated 300m section of the original system. 

Solution 

Once in place the bypass allowed the repair of the original heritage listed sandstone support structures and replacement of the deteriorated steel pipeline section. 

Conclusion

Total project value $1,200,000.00.